The project is located at the intersection of Changping Avenue and Zhanqian West Road, Changping Town, Dongguan City. The bridge has a total length of 552m and is divided into 19 spans. The bridge deck is 20m wide and has two🌼-way four lanes. The span combination of the main bridge is 10 + 60 + 40m, which is a continuous steel box girder. Q345qc and q235qc are adopted in the project, and the total steel consumption is about 2000 tons.
Previous:Tedo Churchill Roosevelt F…
Copyright © 2021 All rights reserved: :Hangxiao Steel Structure Co., Ltd ICP:
Contact number:400-9933-077
Add: No. 🦹2826, Xiaoqing Avenue, Xiaosꦜhan District, Hangzhou, Zhejiang Province
Postal code:311232
Website://www.vandream.com/
E-mail:vandream@vandream.com
Tel:400-1571-080
Add:No. 328, S🐻hengdong village, Xinjie Town🐭, Xiaoshan District, Hangzhou City, Zhejiang Province
Postal code:311232
Website://www.headerboard.cn/
E-mail:handebang@czrxguandao.com
Tel:0571-82645988-7125
Add:No. 2826, Xiaoqin🌃g Avenue, Xiaoshan District, Hangzhou City, Zhejiang Province
Postal code:311232
Tel:0571-56666869
Add:21 / F, Ruifeng international business building, No.♈ 258, Zhonghe Middle Road, 🦩Hangzhou, Zhejiang
Postal code:310003
E-mail:hldesign@czrxguandao.com
Tel:19357657029
✤Add:2826 Xiaoqing Dadao, Xiaoshan District, Hangzhou City, Zhejiang Province, China
Postal code:311232
E-mail:hetepe@czrxguandao.com