壹定发

#

CASE

Viaduct of Chongxian laoyuhang connecting line in Yuhang District (Section II)

16565777526198298DE3.jpeg


The project is located in Yuhang District, Hangzhou city. Our company has contracted 3 steel girder bridges and 7 steel plate composite girder bridges in the second industrial zone. Continuous box girder with bridge width o൲f 26.5m, main span of 70m and 80m, beam height of 3.2m, 2.3m to 3.6m; Three spans and one joint composite steel beam with a main span of 60m, and the other 40m or 50m single span and one joint arrangement. The total steel consumption is about 123000 tons.


Recommendation of relevant cases

Copyright © 2021 All rights reserved: :Hangxiao Steel Structure Co., Ltd  ICP:

Contact us

Stock code
600477

Home

Close